city of vanceburg

W.T. Love Hydroelectric Station

Vanceburg, Kentucky

Construction of this 75 megawatt low-head hydro project was facilitated by prefabrication of structural components in France; thus reducing field assembly time. The project, located on the Ohio River was completed at the existing Greenup Lock and Dam.
CONSTRUCTION METHOD
General Contract 

PROJECT COST
$40 Million 

OWNER
City of Vanceburg 

GREAT PEOPLE. PROVEN RESULTS.

The Ruhlin Company  |  6931 Ridge Road  |  P.O. Box 190  |  Sharon Center, Ohio 44274  |  Phone: (330) 239-2800  |  Fax: (330) 239-1828