Awarded Willow Island Hydroelectric Powerhouse Project
December 15, 2020
The project diverted water from Willow Island Locks and Dam through two horizontal 22-MW bulb turbines and generated an average annual output of about 239 GWh. The site included an intake approach channel, a reinforced concrete powerhouse and a tailrace channel. The gross head of the project is 20 feet.