This project was a part of the Bulk Materials Operations at the Wellsville Intermodal Industrial Park dock located in Wellsville, OH. It included the design, fabrication, delivery, assembly, installation and mounting of the Articulating Boom Pedestal Mounted Crane on the existing captive barge structure floating on the Ohio River. Since the Articulating Boom Pedestal Mounted Crane was mounted on a captive barge floating on the Ohio River, all necessary precautions were taken to safely perform work over and around water in accordance with Federal, State and Local regulations.
Wellsville, Ohio
Design-Build
$2,034,000
Columbiana County Port Authority