This project involved receiving, stockpiling, loading, transporting, and grading 150,000 CY stability berm from one location to another. Scope also included removal, disposal, and storage of marine docks and structures, installation of cofferdams, and demolition of concrete structures.
The project consisted of placing Embankment Stability Berm (ESB) material along the existing dam to allow the seepage cut-off wall contractor access to their work. Work included approximately 160,000 CY of ESB and 6,000 CY of Rip Rap as shoreline protection. In addition, approximately 140 docks along the shoreline were removed and salvaged.
Fairfield County, Ohio
General Contractor
$4,841,000
Ohio Department of Natural Resources (ODNR)